Fire detection in tunnels during construction can be carried out easily and cost effectively with the new flexible d-LIST sensor cable system, says Listec.

“Rugged and uncomplicated controllers use the highly-sensitive electronic sensor cable SEC 15 to monitor storage areas, machinery, mechanical equipment, containers, etc. enabling early recognition of overheating and fire,” adds Listec.

Listec

Tel: +49 8083 5385 0
Email: info@listec-gmbh.de
Web: www.listec-gmbh.de


The New flexible d-LIST sensor cable system