Carbotech Fosroc
Tel: +49 201 172 1320
Fax: +49 201 172 1097
Email: info@carbotechfosroc.com
Carbotech Fosroc produces a range of waterproofing solutions including injection systems, admixtures, grouts and pipeline coatings as well as tools and equipment. Its injection systems are based on component polyurethane resins, organo-mineral resins, acrylates and micro cements. The company has a history of successful application in mining and tunnelling even in the presence of highly pressurised water. Some of the most important applications apply to anchoring, sealing, cavity filling, rock stabilisation, and crack injection. Another bestseller is Aquaprene C, a hydroexpansive elastomeric seal for tunnel segments, suitable for precast concrete, cast iron and steel tunnel segments as well as prefabricated structures, shafts and tanks. It can resist pressures of over 30bar, has high durability and has the flexibility to accommodate alignment tolerances between segments.
Tel: +44 1992 523811
Fax: +44 1992 524046
Email: delta500@ukf.net
The studded structure of the Delta PT Membrane for negative side water management is designed to equalise damp pressure and divert, control and drain water via a continuous void it creates. The membranes can also divert aggressive groundwater to the station culvert. The membrane is fixed back to the substrate with sealed fixing plugs spaced at 250mm horizontal and vertical centres. Delta’s system incorporates a mesh, welded to the internal face of the membrane, that supports an anhydrous calcium sulphate plaster. The Delta-PT can also be used in a double shotcrete layer. It conducts water away between the inner and outer lining, and serves as the base for the reinforced inner lining. The system does not merely serve to dam, divert or hide the problem; it provides long-term control and protection of internal finishes.
DeNeef Construction Chemicals
Tel: +1 936 372 9185
Fax: +1 936 372 9897
Email: info@deneef.com
DeNeef manufactures and distributes a variety of water control and soil stabilisation products for the civil engineering industry such as Hydro Active polyurethane chemical grouts, the AC 400 acrylate chemical grout and a range of Microfine cements. The latest additions to its range includes Gelacryl, a two-component acrylic resin that can be injected into pores, capillaries, cracks, voids and honeycombed concrete. Once polymerised it forms a resilient, highly elastomeric gel which is non-corrosive, non-toxic, and resistant to most solvents.
Elkem Materials
Tel: +47 38 01 7500
Fax: +47 38 01 4970
Email: torstein.Pedersen@elkem.no
Over the last three years Elkem has developed the Multi-Grout complete rock injection system for tunnels and storage caverns. The system combines water blocker, timer, penetrator, cement and dispersant offering a reduction in groundwater in-leakage, control of settlement, reduction or elimination of waterproof membranes and contaminated water disposal. The system was developed in answer to issues such as pre-grouting, post-grouting, large volume and/or high-pressure inflows, shallow overburden weakness zones and sensitive environmental constraints. The Multi-Grout system has been adopted by the Norwegian Public Road Administration and has been successfully applied in several tunnel contracts contracts including Storhaug and Romeriksporten..
Expansion Control Systems International
Tel: +44 113 273 8942
Fax: +44 113 273 0180
Email: sales@ecs-int.co.uk
ECS International manufactures seals, joints and injection grouting equipment for tunnel waterproofing. It also offers the SHO-BOND lining system, which forms a watertight tertiary lining channelling water behind the panels and into a drainage trough at the roadway level. This system is suited to the renovation of older tunnels suffering gradual leakage from the surface. It offers a lightweight, easily mounted decorative lining with heat insulating properties.
Flag
Tel: +39 035 494 0949
Fax: +39 035 494 06 49
Email: seregni@flag.it
Flag has produced synthetic waterproofing membranes since 1963. In 1980 it established its first laboratory for research and development into PVC and modified polyolephine membranes which has now become the centre of a major programme into waterproofing methods. Flag currently offers a range of thermoplastic, weldable membranes including the Flagon PVC and Flagon TPO membranes. Produced by co-extrusion or cast methods, Flag products incorporate polyester fibres for reinforcement, and their wide range of specifications correspond to a variety of waterproofing requirements in civil, hydraulic engineering and building industries. Flag has supplied millions of square metres of waterproofing membranes throughout the world including projects such as Melbourne City Link, Tai Lam – Hong Kong, the Marseille TGV tunnel, Landeck Tunnel – Austria , the Lisbon Metro, and Bellavista Tunnel – Colombia among its references.. The company also produces a full range of accessories, in particular the Saldamax automatic welding machine, a light, ergonomic tool for dual track weldings.
Grace Construction Products
Tel: +44 1753 637613
Fax: +44 1753 637677
Email: chris.vonpatzelt@grace.com
Grace Construction Products has pioneered the development and use of Bituthene self-adhesive membrane systems. Continuing development of the technology has led to the introduction of Preprufe, a multi-layered waterproof membrane that forms a continuous mechanical bond with wet concrete poured against it, making application simpler and more reliable. Procor is a liquid-applied waterproof membrane for sub-structures and elevated decks. A fully bonded and flexible waterproofing system for quick application, it can be laid in ‘bays’ to permit other trades to continue operations. Grace waterproofing systems provide resistance from chemical infiltration to soils and job sites, remaining flexible under various climatic and environmental conditions.
GSE Lining Technology
Tel: +49 40 767420
Fax: +49 40 7674233
Email: Europe@gseworld.de
Formed in 1995, when manufacturers Gundle and SLT merged, GSE Lining Technology is now one of the world’s largest manufacturers and installers of geomembranes. In the last 10 years, it has installed over 1M.m3 of linings made from various flexible polyethylene resins. GSE offers complete tunnel waterproofing solutions, including the PE-LLD system, comprising a geomembrane lining combined with fixation buttons and waterstops, manufactured from the same raw material for optimal weldability. The PE-LLD system offers a wide range of waterstops for a range of tunnel design requirements. GSE also supplies a complete sewer lining system using a specific HDPE liner which anchors itself into the concrete.
Tel: +49 5741 4080
Fax: +49 5741 4008 40
Email: info@naue.com
Naue Fasertechnik has been manufacturing geomembranes for major civil engineering projects since 1968. Today, it produces a range of geosynthetic materials for different tunnelling applications. One of the company’s solutions for substrates subjected to high hydraulic pressures as well as areas of seepage is to use a Carbofol polyolefin geomembrane, with a Secutex non-woven geotextile to protect from rough surfaces such as shotcrete. Geosynthetic drainage systems such as Secudrain can also be used to transport and discharge groundwater or seepage. The chemically and UV-resistant Carbofol geomembrane provides a complete seal against the most aggressive mountain water, providing long-term groundwater and seepage protection. Carbofol’s white glazed surface immediately reveals any accidental damage so repairs can be quickly undertaken. Welding of seams and repairs is carried out with state-of-the-art welding equipment by certified installers.
Oxford Hydrotecnics
Tel: +44 1869 346001
Fax: +44 1869 345455
Email: help@oxford-hydrotechnics.co.uk
Oxford Hydrotechnics specialises in advanced resin injection and grouting techniques. It boasts over 30 years of experience on complex projects, dealing with issues such as controlling sea water inundation; sealing shafts constructed through running sands; sea water ingress through defective concrete; sealing substantial hydrostatic head in partially collapsed ground; high water flows through fractured rock; consolidating mobile ground forming thrust blocks for pipe jacking; and underwater resin injection using trained divers.
Tel: +49 40 7667 2761
Fax: +49 40 7667 2293
Email: andreas.diener@phoenix-ag.com
Since 1968, Phoenix has developed compression profile seals for TBM driven tunnels, fitted with prefabricated steel or concrete segments. Phoenix has developed more than 40 different profile shapes and established eight different cross-sections, allowing applications from supply and disposal tunnels to large railway and road tunnels. A recent development is the anchored seal, which is secured directly into the concrete segment. With no gluing or gaskets, this saves cost, cuts environmental pollution, and saves time in the segment factory for correction of imperfections and cleaning.
Tel: +41 1857 1111
Fax: +41 1857 1100
Email: info@rascor.com
The Rascor Group covers the whole field of preventative and remedial waterproofing. The company offers a range of services, including design, studies for analysis, preparation and assessment of tender documents, performance of waterproofing works and acceptance of defects correction/handover at the end of a defects liability period. Rascor’s newest introduction is its White Tank water impermeable concrete, part of the RASCOtec preventative waterproofing system. Tried and tested on the Zurich Airport scheme, White Tank provides a waterproof barrier, the joints being sealed by specially incorporated units, without the need for bituminous membranes. Rascor has recently developed RASCOflex, an acrylic grout with a viscosity comparable to water, allowing the finest cracks to be grouted. It is solvent free, and is fire resistant and non-flammable. Controlled swelling with 10-15% increase in volume occurs upon contact with water, causing negligible pressure build-up. A waterproof barrier is achieved through the swelling action; it also has a high compatibility with metal and plastics and is frost resistant.
Sarnafil Group
Tel: +41 41 666 9966
Fax: +41 41 666 9700
Email: info-sarnafil@sarna.com
Sarnafil has provided waterproofing solutions for more than 100 excavated and open-cut tunnels. Its systems range from single-ply membranes for simple structures to sophisticated test and injection systems for the most demanding projects. The simple, loose-laid, single-ply system can be extended to a compartment system by using waterstops or fully adhered membrane strips to create cells, limiting leakage in case of damage. Each cell is fitted with an injection nozzle to enable repair work, restoring water-tightness in any damaged cell. More complex systems provided by Sarnafil include the double-ply test and injection system. A membrane with a nubbed backside forms a cavity that can be vacuum tested for tightness during construction. Once the membrane is covered, cell repair can be carried out by injection. Sarnafil also provides leakage run-off systems, accessories, application devices and a broad spectrum of service programmes.
Tel: +41 56 649 3276
Fax: +41 56 649 3204
Email: info@aliva.com
Sika AG manufactures a wide range of waterproof membranes, waterstops, seals admixtures and grouts, and has established a global presence in the tunnelling industry for quality and durability. For more information on Sika products, equipment and tools please visit its website at www.sika.ch.
WEBAC Corporation
Tel: +1 714 662 4445
Fax: +1 714 662 4446
Email: webac@webac.com
The Webac Corporation offers concrete systems solutions with a focus on waterproofing and crack repair. However, injection grouts and resins to prevent water infiltration in concrete structures are its speciality. Products range from water activated grout sealants and gels to moisture insensitive epoxies for structural repairs. International drinking water contact approvals are available for environmentally sensitive applications. WEBAC injection pumps and accessories are designed to complement each other for best results at the job site. Injection packers are available in all shapes and sizes to suit requirements and budget. The Inject Tube System seals cold joints in new construction safely and permanently. New products include WEBAC 4525 underwater epoxy and the B-Type ‘economic’ packer line.
Xypex Singapore
Tel: +65 299 5836
Fax: +65 299 5893
Email: info@xypex.com
Xypex concrete waterproofing products are added to the mix during batching. They react with water and the by-products of cement hydration to form insoluble quartz-like crystals in concrete capillary tracts, resulting in permanent in-depth penetration and protection of the structure. Xypex Admix C-2000 NF for new tunnel constructions consists of Portland cement and active chemicals. Contact with moisture generates a non-soluble crystalline formation throughout the pores and capillaries of the concrete to seal and prevent penetration of water and other liquids from any direction. Advantages of the Xypex Admix include resistance to extreme hydrostatic pressure and to aggressive chemicals, cost savings and flexibility in construction scheduling. Other products from Xypex include Xypex Concentrate, a cementitious slurry coating, for protection of construction joints and use on renovation projects. Xypex products have been used worldwide for more than 30 years, more recently on the Mass Transit Railway (North East line), Singapore.