The proceedings are a valuable reference on geotechnical problems peculiar to Africa and for engineering solutions to local problems. Topics covered include: foundation engineering and lateral support; methods of design and analysis; monitoring, laboratory and field testing; soil improvement; and case studies. Data on the properties of African soils , the properties of residual and tropical soils, as well as climate related problems ,are also covered.
