To date, bids have been received for Contract 104 from AMEC; Spie Batignolles; Balfour Beatty; Jarvis/Alfred McAlpine/Adtranz; and Amey/CSEE/D&G for work at St Pancras Station, London, on the CTRL 2 scheme
Serving the tunnelling industry since 1969.
To date, bids have been received for Contract 104 from AMEC; Spie Batignolles; Balfour Beatty; Jarvis/Alfred McAlpine/Adtranz; and Amey/CSEE/D&G for work at St Pancras Station, London, on the CTRL 2 scheme