Anew safety drive has been launched for the
UK’s Channel Tunnel Rail Link using a special vehicle for safety demonstrations and training.
The so-called Target Zero Truck is a joint initiative of designer and project managers Rail Link Engineering and the six contractors’ groups working on Phase One.