Metro Line 1 in the South Korean port city of Inchon has been formally opened. The 24.6km long north-south line from Kyeyang to Tongmak is fully automated. Line 1 runs fully in cut+cover tunnels and has 22 stations.
Serving the tunnelling industry since 1969.
Metro Line 1 in the South Korean port city of Inchon has been formally opened. The 24.6km long north-south line from Kyeyang to Tongmak is fully automated. Line 1 runs fully in cut+cover tunnels and has 22 stations.