Shares in construction and engineering group Kvaerner rose last month on the news that Aker Martime has acquired a 23.39% stake for Nkr3bn (US$349M).
Serving the tunnelling industry since 1969.
Shares in construction and engineering group Kvaerner rose last month on the news that Aker Martime has acquired a 23.39% stake for Nkr3bn (US$349M).