ARUP is leading the engineering team entrusted with the EIS to study a tunnel alternative to costly refurbishment or replacement of the existing heavily congested 45-year-old bridge across the Hudson north of New York City (T&TNA, May 2001).

Serving the tunnelling industry since 1969.
ARUP is leading the engineering team entrusted with the EIS to study a tunnel alternative to costly refurbishment or replacement of the existing heavily congested 45-year-old bridge across the Hudson north of New York City (T&TNA, May 2001).