The second Herrenknecht EPBM deployed on Caracas’s twin-bore Metro Line 4 project broke through it’s first section on 6 September – the 610m stretch between Plaza Venezuala and Los Caobos.
After inspection, the machine will follow the second Herrenknecht in a 1,130m drive on to Parque Central.
More details in October’s T&TI