A Qatari diplomat has been recalled home after being caught speeding at 214kmph in the Mont Blanc tunnel between France and Italy. He was travelling at over three times the speed limit.

Serving the tunnelling industry since 1969.
A Qatari diplomat has been recalled home after being caught speeding at 214kmph in the Mont Blanc tunnel between France and Italy. He was travelling at over three times the speed limit.