Mumbai-based Valecha Engineering has formed a joint venture with Ukrainian tunnelling contractor, Ukrmetrotunnelbud, to build a tunnel on the Laole-Qazigund section of the Udhampur-Srinagar-Baramulla railway.
Serving the tunnelling industry since 1969.
Mumbai-based Valecha Engineering has formed a joint venture with Ukrainian tunnelling contractor, Ukrmetrotunnelbud, to build a tunnel on the Laole-Qazigund section of the Udhampur-Srinagar-Baramulla railway.