An Austrian artist has begun a ludicrous project to dig a 68km long tunnel by hand. Breakthrough is scheduled in 5,600 years.

Serving the tunnelling industry since 1969.
An Austrian artist has begun a ludicrous project to dig a 68km long tunnel by hand. Breakthrough is scheduled in 5,600 years.