Yildirim stated that the tunnel ‘brother’ of the first ever submarine tunnel of Turkey to connect the Asian and European sides of the Bosphorus strait under the Marmara Sea, would be opened in 2015.
Serving the tunnelling industry since 1969.
Yildirim stated that the tunnel ‘brother’ of the first ever submarine tunnel of Turkey to connect the Asian and European sides of the Bosphorus strait under the Marmara Sea, would be opened in 2015.