1) Gilon tunnels, Akko-Karmiel railway
2) Makkah King Abdullah road tunnel
3) Kuwait City metro
4) Sinai road tunnel
5) Strategic Tunnel Enhancement Programme (STEP)
6) Al Salam Street Tunnels
7) Abu Dhabi Underground Driveway
8) Airport traffic tunnel
9) Covoada road tunnel, Sao Nicolau
10) Bujagali hydropower plant
11) Qatar Rail Integrated Network
12) Polihali Dam
13) Ingula Pumped Storage Scheme
14) Bakhtiari hydropower plant
15) Rusizi IV hydropower plant
16) Ruhudji hydropower plant
17) Kuwait International Airport transport tunnel
18) Kabwelume hydropower plant
19) Kundabwika hydropower plant
20) Lom Pangar hydropower plant
21) Stiegler’s Gorge hydropower plant
22) Doha north sewage treatment plant
23) Doha south sewage treatment plant
24) Inner Doha Resewerage Integrated System study
25) Annaba-Ramdane Djamel rail tunnels
26) Route du Littoral Coastal Driveway, Reunion Island
27) Al Uruba and Abu Bakr Siddiq road Extensions
28) Kaleta hydropower plant
29) Kariba north bank hydropower plant
30) Karuma hydropower plant
31) Kabompo Gorge hydropower plant
32) Mphanda Nkuwa hydropower plant
33) Rusumo Falls hydropower plant
34) Rumakali hydropower plant
35) Cairo Metro
36) Aras hydropower plants
37) Al Khor-Al Ruwais road project
38) South Raanana rail interchange
39) Doha orbital highway
40) Souk Al Juma sewers
41) Al Sufouh tramway
42) Algiers Metro
43) Bandama hydropower plant
44) Sassandra hydropower plant
45) Comoe hydropower plant
46) Cavally hydropower plant
47) Sidi Bernoussi water treatment plant connection
48) Algiers sewer connection
49) Grand Inga hydropower plant
50) Ruwais gas storage tanks
Additional material by timetric.com and www.construction-ic.com