About 40m of the 2,625m Hongling Tunnel, an under-construction section of the Hukun Railway, collapsed in Xinhua county of Loudi city on 30 June. The workers had been kept alive with food and water, which was lowered on a rope through ventilation tubes.
The cause of the accident is under investigation.