Geodata
Tel: +43 3842 26 5550
Fax: +43 3842 26 5550
Email: office@geodata.at
Web: www.geodata.at
The Geodata tunnel scanner is a high-precision measuring and analysis system for the efficient and continuous documentation of tunnels, galleries, caverns and shafts in all phases of construction and during the entire utilisation period. The system provides both building owners and performing companies with similar benefits and utilisation potentials right up to significant cost savings: increase in quality with regard to the quality of the excavation profile, the shotcrete thickness etc.; control and optimisation of the construction process; recording for geological/geotechnical purpose and spatial deformation analysis.
A simple and continuous recording independent of lighting and surface structure can be done within three minutes per approx. 10m at a grid size 20mmx20mm. During the course of the survey, the tunnel surface is scanned with laser pulses in a dense grid. Immediately after the recording, the results are available as 3D cartesian coordinates as well as intensity values for the graphical display. The accuracy of the system is within ± 10mm.
Häny
Tel: +41 1 925 4111
Fax: +41 1 923 6245
Web: www.haeny.ch
Häny offers one of the largest ranges of grouting equipment. There are 10 different pump models available with an output of 1.2-13m3/hr and pressures up to 200 bar. Five different High-shear colloidal mixers guarantee highest quality mixes within a very short time period. Each mixer can be complemented with a suitable sized agitator.
The grout pumps of the ZMP 700 series are most suitable for backfilling of tunnel liners as well as for pressure grouting. This combined use saves cost and space on the backup systems of TBM’s. During normal operation, the pumps are used for backfilling. In difficult areas where pre-grouting is required, the same pumps are used for pressure grouting. In a HCM high-shear (colloidal) mixer placed near the pumps, any type of cement can efficiently be mixed. In the same mixer, bentonite slurry can be mixed for cleaning out the grout pipes in the tail shield.
The new HFR Recorder incorporates a graphic display to visualise the curves of pressure and flow. Permeability tests with calculation of the permeability and the Lugeon value as well as injections according to the GIN method can also be performed. A RS 232 interface allows real time monitoring on a PC locally or remote through modems. The HFR system can monitor 1 to 8 grout lines simultaneously.
Hepworth
Tel: +44 1530 240 000
Fax: +44 1530 240 013
Web: www.hepworthconcrete.co.uk
Hepworth Concrete has added 3m caisson rings to its range, adding further to its capability in supplying pipe and associated systems for jacking and microtunnelling applications. The rings provide an ideal means of constructing shafts and reception pits. The caisson rings are available in 0.75m and 1.0m depths. The range includes a base unit, to which a steel cutting shoe can be fitted to assist in the ‘sinking’ process. Hepworth also supplies sealing rings, caissons have a cast-in caulking groove to allow secondary sealing, if required.
Availability of the rings complements the company’s range of HepCollar jacking/microtunneling pipes, produced in diameters from DN 450 to DN 2400.
Leister Process Technologies
Tel: +41 41 662 7474
Fax: +41 41 662 7416
Email: leister@leister.com
Web: www.leister.com
A gap in overlap welding for vertical and horizontal applications is now closed with the TriacDrive semi-automatic welding machine from Leister. The TriacDrive is especially well suited for overhead welding and for applications in restricted spaces, e.g. for roofing membranes in a light dome, for welding joining tape in tunnel construction or for joining geomembrane liners prior to extrusion welding. For the user, an important feature of this semi-automatic overlap welding machine is its continuously regulated temperature and speed, so the user only has to concentrate on the application force. This results in a higher quality of welding as well as improved welding seam quality. Its simple handling makes the TriacDrive extremely attractive, along with its extremely low weight of just 2.3kg incl. cable.
MBT UGC International
Tel: +41 1438 2310
Email: ross.dimmock@degussa.com
Web: www.ugc.mbt.com
Underground construction is a business of worldwide projects driven by hi-tech specialists, involving large capital investments and tight time schedules. Rapid changes in sprayed concrete technology and the greater acceptance of the wet mix system have prompted a change in application techniques and, as a result, equipment. The mechanical properties of the concrete have also changed with the addition of steel and plastic fibres.
Degussa’s Underground Construction Group, UGC, offers a complete range of services, from expert consulting to professional project management. Innovative products, systems and equipment technology are the direct result of this knowledge and experience. These factors enable us to use an imaginative but cost-effective approach to solve engineering problems on site with the use of chemical technology, with full job support.
McElroy
Tel: +1 918 836 8611
Web: www.mcelroymfg.com
McElroy has always been the benchmark for polyethylene fusion equipment. The TracStar 500 Series II is the flagship of this 30 year bloodline and tackles any job in the most difficult of work sites. The flexibility of the removable jaw assembly, all terrain mobility, and an onboard generator gives the user the confidence of dependability and versatility. It has been beefed up from stem to stern, fuses true 500mm pipe and has the option of the Coach fusion control system, (to control the hydraulics, heater temperature and allows for remote operation) or conventional hydraulic controls. The Series II is now the most versatile and productive fusion machine in the world.
MEYCO Equipment
Tel: +41 1 244 0700
Fax: +41 1 244 0707
Web: www.meyco-equipment.com
MEYCO Equipment, as part of the UGC organisation within the Degussa Group, benefits from outstanding know-how and products are harmonised to best utilise this advantage. The objective is to offer total solutions to customers, whether for dry or wet concrete spraying or even mobile and roadworthy equipment. Equipment is built for, or tailor-made to, customer requirements.
The MEYCO Suprema with its Total Dosing Control system provides unsurpassed dosing accuracy. The TDC system is also available with MEYCO Potenza, which over the last year has established itself as an industry standard for spraying mobiles. There are now Potenzas in operation on sites around the world. Both machines are equipped as standard with MEYCO Data for compiling and extracting of performance data, transferring to PC for processing and evaluation.
The new MEYCO Oruga is a compact spraying mobile that is equally at home in mining, tunnelling or slope protection. Latest developments include the next generation MEYCO Logica robotic spraying manipulator.
Paus
Tel: +49 5903 7070
Email: fpaus@paus.de
Web: www.paus.de
Recently, Paus introduced the new 852 TSL-T7. This unique machine, based on an articulated loader, is a ‘self-propelled elevating work platform’ with EC-type approval. With this machine, a gap in access technology for tunnelling has been closed. Reaching working heights up to 8m, working-platform vehicles or telescopic loaders are not required; securing and maintenance works can easily be managed with this small and manoeuvrable machine.
The main feature of the machine is the ability to operate the entire machine including all driving functions from the basket. The base machine can of course also be used as wheeled loader and telescopic-swivel loader. The design of the 852 TSL combines: articulated steering for exceptional manoeuvrability; telescopic boom for greater range of action; slewing characteristics of the boom to cover greater ranges and perform work to the side.
Phoenix
Tel: +49 40 7667 2761
Fax: +49 40 7667 2545
Email: andreas.diener@phoenix-dt.de
Phoenix has been involved in the development and supply of sealing gaskets for segmental tunnel linings for over 30 years. Since its pilot project in 1969, the first 3 tubes of the Elbe River road tunnel in Hamburg, Phoenix has supplied its tailor made gaskets and adhesives to more than 140 tunnel projects worldwide.
Phoenix has been faced with rapidly increasing and changing requirements: increasing tunnel diameters, leading to higher demands concerning the construction tolerances between segments; increasing water pressures, due to larger tunnel depths; increasing demands for durability of the gaskets, with regard to minimum service life of tunnels up to 120 years (stress relaxation behaviour); higher demands with regard to material resistance, for example against aggressive chemicals underground. To date Phoenix has developed more than 40 different profile shapes, ready to meet the different requirements and specifications of today’s tunnel projects. Phoenix is currently supplying to projects such as HSL “Groene Hart” Tunnel in the Netherlands, the Arrowhead Feeder Project near LA and the new Lines of the Toulouse Metro in France.
Promat International
Tel: +32 157 18 102
Fax: +32 157 18 109
Email: info@promat-tunnel.com
Web: www.promat-tunnel.com
Promat International has launched the new Promatect-T board, with multiple advantages for the protection of concrete structures, construction of escape routes, fire doors, cable systems and ventilation systems. Designed to answer the most severe fire scenarios, Promatect-T is not just a barrier to fire, but for a certain period of time plays the role of fire brigade, by cooling down the concrete interface in pre-designed steps. Afterwards becoming an efficient thermal insulator, at fire temperatures up to 1400°C. The engineered product matrix can easily secure a same temperature value at the interface with the concrete, with only half the thickness of other products.
Although designed as panels, the engineered matrix of Promatect-T allows the board to be curved on-site, and will cover surfaces with a diameter of curvature down to 8m. Easy to install by clean techniques, the application of Promatect-T can also be realised on existing tunnels.
Intensive and extensive testing for specialist approval was carried out after a detailed in-house testing programme. Not only the fire protection performances were investigated, but also the behaviour in typical mechanical (like pressure/de-pressure as induced by vehicles traffic) and chemical aggressions (like highly polluted atmosphere by exhaust gases).
Putzmeister
Tel: +49 7127 5990
Fax: +49 7127 599520
Web: www.putzmeister.de
Putzmeister produces a wide range of high-pressure concrete pumps, concrete placing booms, equipment for wet-shotcreting in tunnels and mines, muck conveying pumps, as well as high-density solids pumps. Additionally the German manufacturer has developed different types of delivery line systems for tough operation. A wide range of accessories such as shut-off valves, direction valves and rotary distributors make the company’s tunnelling equipment very versatile.
PM stationary concrete pumps have reached conveying heights up to 532m and horizontal pumping distances of 2015m. The truck mounted concrete pump M 24-4 is especially designed for concrete placing in low halls and tunnels. Due to its ‘multi-Z-folding’ boom it has an unfolding height of less than 5m and a horizontal reach of 19.5m.
For wet shotcreting Putzmeister offers mobile spraying robots as well as trailor-mounted units. As far as mobile shotcrete equipment is concerned Putzmeister and Swiss based manufacturer Sika entered into a strategic global alliance in June 2003. While Putzmeister is responsible for production of wet shotcreting systems, Sika is to serve as the exclusive sales agent worldwide.
The new ‘Sika–PM 500 PC’ shotcrete manipulator is the first system developed by both companies for tunnel builders. Type ‘500 PC’ provides a very compact design with a sturdy shotcreting boom. It can be equipped with two admixer tanks of 1,000l capacity and with a 600l water tank. For smaller tunnel cross sections the shotcrete mobile type ‘Sika-PM 400 R’ is available.
Sarnafil International
Tel: +41 41 666 99 66
Email: tunnel-waterproofing@sarna.com
Web: www.sarnafil.com
Sarnafil is one of the European leaders in waterproofing systems. Products and services include advanced waterproofing systems for drained tunnels and projects with high water pressure; improved waterproofing membranes in PVC and flexible polyolefines (FPO), providing enhanced mechanical properties and superior service life expectancy; fully compatible accessories such as geotextiles, waterstops and protective layers.
The development of a new sealing system for tunnels based on Velcro fastening was concluded and is now ready to be launched. The benefits are based on increased efficiency of application and improved safety with regard to possible substrate movement.
Shotcrete Technologies
Tel: +1 303 567 4871
Fax: +1 303 567 4605
Email: mloevlie@aol.com
Shot-Tech Waterline provides a one-step solution for relief of hydrostatic pressures in mines and tunnels. Shot-Tech Waterline is a unique membrane lining system used for water control in combination with shotcrete. It is a combination of thick, fibre-wool drainage media permanently welded to a waterproof membrane. When secured with bolts, mesh, or a Hilti gun with the fibre facing in, and the membrane out, it is self-sealing. Once the plastic film is peeled off it exposes a strong adhesive surface ideal to receive shotcrete. Waterline can be formed around unusual shapes, and remains pliable even at low ambient temperatures.
Over 130 Shot-Tech Robotic Arms are in use all over the world. Developed as an alternative to the expensive ‘one size fits all’ shotcrete rig. Shotcrete technologies provides a cost saving and effective robotic spraying arm that fits most types of carriers from 4WD trucks to Railcars to Bobcats. Once a shotcrete project is complete, the unit may be demobilised and reconfigured for the next application.
Sika Tunneling & Mining
Tel. + 41 56 649 31 11
Fax. + 41 56 649 32 04
Email: info@sika-stm.com
Web: www.sika-stm.com
Sika Schweiz has adapted its sales activities for underground construction to the needs of its customers by establishing an internationally active division ‘Sika Tunneling & Mining’. Sika Tunneling & Mining has been structured to act as a problem-solving partner for tunnelling and mining projects. Research and development, marketing and sales of construction chemicals, concrete spraying machines and waterproofing have all been brought together into this division.
Recent developments, based on the latest technology and research, are the shotcrete robots on the Herrenknecht TBM S-210 for the Gotthard base tunnel, contract 452 Faido and contract 554 Bodio.
Sika and Putzmeister have recently entered into a strategic global alliance, with Putzmeister responsible for the production of shotcrete systems. Sika is to serve as the exclusive sales agent. Sika will continue to produce Aliva rotor machines. The first joint systems, the Sika-PM400 and Sika-PM500, will shortly be launched on the market.
Uelzener Maschinen
Tel: +49 6196 5840
Fax: +49 6196 71273
Email: uelzener@aol.com
Web :www.uelzener-ums.de
Uelzener supplies the tunneling industry with continuous mixers for dry premixed materials, wet mortar transport containers, mixing pumps, mortar pumps with variable output. The mixing and pumping unit Uelzener E405/S35L is used in backfilling, injection, anchoring and grouting. Dry premixed materials are mixed in the continuous mixer and are pumped with adjustable output The unit is available with electric drive or as air driven.
W Giertsen Tel: +47 55 94 3000
Fax: +47 55 94 3115
Email: tunnel@giertsen.no
The WG Tunnel Arch System (WGTA) is a complete fire retardant lining system for water leakage, humidity protection, and frost insulation of road tunnels. The patented system consists of steel pipe arches spaced at 1.5m-2m combined with PVC-coated polyester fabric. All joints of the fabric are hot air welded to produce a guaranteed waterproof surface. Access is possible through the sidewall for safety inspections of the rock surface. Each section of WGTA is easy to replace.
The system is already well known in Scandinavia as the most cost efficient system for humidity and water leakage insulation in low-traffic road tunnels.
The WG Tunnel Sealing System (WGTS) is a patented system, which provides permanent sealing of humid rock walls and ceilings in an extremely cost effective and efficient manner.
The WGTS system consists of a PVC-coated polyester fabric, suspended inside the rock cavern with a system of bolts and wire. Leakage water is led to a drainage system. The PVC coated polyester fabric is specially designed to resist the chemical environment in a tunnel, and the expected lifetime of the system under humid conditions is estimated to be a minimum of 50 years.
Combined with dehumidifiers, the system provides an ideal environment for corrosion-free storage of sensitive equipment. The material has been approved by fire authorities for use in tunnels.