Sweco’s assignment includes planning of a 9km long tunnel on Road E134. The company will contribute specialists such as geotechnical engineers, geologists, environmental experts and design engineers. As a result of the road project, the current hilly stretch of 23kms will be reduced to a straight and even distance of 12km.
"This is an important road project in the heart of Telemark. We look forward to developing a solution that increases traffic safety, shortens travel time and reduces environmental impact," said Tron Kjølhamar, president of Sweco Norway.