The reasons given in an LTA report included SMRT lapses during a trackside fire at Newton Station, rail defects on the Circle Line and two faults of train movement. The maximum fine a public transport operator can face is SGD 1M (USD 800,000) per incident.
The total penalties will be donated to the Public Transport Fund to "help needy families with transport fares".