The trains are fully air conditioned and a lot more spacious than the current models on the London Underground.
The Inspiro is also 30 per cent more energy efficient and 20 per cent lighter than similar modern Tube trains.
Serving the tunnelling industry since 1969.
The trains are fully air conditioned and a lot more spacious than the current models on the London Underground.
The Inspiro is also 30 per cent more energy efficient and 20 per cent lighter than similar modern Tube trains.