The TKO-LT Tunnel will include a 2.6-mile (4.2m), two-lane highway connecting Tseung Kwan O (TKO) at Po Shun Road in the east with the proposed Trunk Road T2 in Kai Tak Development in the west.
The tunnel, along with the Central Kowloon Route and Trunk Road T2, will form part of the city’s Route 6; becoming an east-west express link between the West Kowloon and TKO areas. The completion of Route 6 is anticipated to reduce the travel time between West Kowloon and TKO from 30 minutes to 12 minutes.
"Since 2009, we have been involved in the planning of this project, providing preliminary design and other services," said John Dionisio, Aecom chairman and CEO. "We are very proud to be able to contribute to the project’s next phase."