The machines are to bore in the typical Bangkok soil composed of clay, stiff clay and very stiff clay. As the machines may encounter the wooden piles or pieces from previous ancient houses, the design of the cutterhead features a cone crusher. The machine is also equipped with an Enzan-Terratec laser guidance system and a data recorder.
