When and where

April 22-28
San Francisco
www.wtc2016.us

Monday: The Opening Ceremony will welcome Peter Kaiser, a professor and Chair for Rock Engineering and Ground Control at the Bharti School of Engineering of Laurentian University in Sudbury, Canada, and the 2013 TAC tunneller of the year. Leading the Muir Wood Lecture, Peter Kaiser will develop its proposals to meet the challenge of deep underground construction projects, a reflection deriving from deep-mining and tunnelling experiences in the Alps.

During the afternoon, a special workshop will be dedicated to the Building Information Modelling (BIM), an intelligent process based on 3 to 5D modelling for an infrastructure project planning, conception, simulation and construction. Experience sharing, prospective analysis of future BIM developments, testimonials of engineers, will punctuate the workshop.

Tuesday: From 8.30 AM to 12.30 PM, the ITA Open Session will feature advances the industry is achieving across a broad cross-section of topics affecting the underground construction business. It will notably include conventional and mechanized tunnelling, controlled blasting, fiber-reinforced precast concrete segments, the measurement and interpretation of in-situ stresses for application to high stress environments and pressurized conveyances, the challenges that we face in developing underground space in urban settings, and the management of construction risk through improved contracting practices.

Then, on the afternoon, the ITA Committee for Underground Space (ITACUS) will organise a "Think Deep" session dedicated to "Tunnels: the new urban paradigm". In the perspective of the UN Habitat III Conference, that is to take place next October in Quito, Peru, the ITACUS will launch discussions around central questions. As the role of cities is crucial to engage sustainable development policies, what solutions can tunnels and underground provide to contribute to a new urban agenda? Should public authorities only favour underground people transportations through Mass Rapid Transit Systems? Key speakers, like Ray Sterling, Professor Emeritus and Research fellow in Civil Engineering at the Louisiana Tech University, will introduce the public to the concept of urban underground freight.

On the evening, the countries willing to host the World Tunnel Congress 2019 will present their candidacy.

Wednesday: As the global Internet of Things market is booming (until reaching a USD 11tr potential impact per year in 2025, for up to 80 billion connected objects), it currently makes strong inroads into the underground space industry. What are the impacts of the accelerating digitalization on tunnels and underground spaces? How does digitalization currently manifest itself in the tunnelling industry? What are the ongoing developments and innovations in that matter? During a special session launched on Wednesday morning 27th (8.30-11.30), the ITA Technological Committee will tackle these crucial questions in attendance of a guest speaker from SIGMA.

Also, selected ITA Tech’s prime sponsors will give concrete examples of underground projects in which they have implemented the latest digital technologies: Big Data management, monitoring, measuring, control, automation, machine diagnosis, maintenance, safety, risk reduction, process optimization.

 

Exhibitors list
No Exhibitor Name Description Booth No
1 ABC Industries, Inc   315
2 ABC Ventilation Systems   1207
3 Advanced Concrete Technologies   1115
4 Aecom Aecom delivers integrated solutions to major tunnel projects, totalling more than 1,000 miles worldwide. Our experts are well versed in all methods of tunneling in every type of ground condition. Aecom connects knowledge and experience across our global network of experts to help clients solve their most complex challenges. 314
5 Aerix Industries   1330
6 AFTES Paris 2017   810
7 AFTES Plant Equipment Branch   815
8 Agru America, Inc   1316
9 AIL Mining   1102
10 Akkerman   1315
11 Alpine Equipment   514
12 Amberg Group   916
13 American Chemical Technologies, Inc   418
14 Amix Systems Ltd   619
15 Antraquip Corp   708
16 ArcelorMittal Wire Solutions   822
17 Arup Arup is a trusted industry leader in the planning, design and delivery of underground projects of all types and sizes. Arup’s multidiscipli- nary, collaborative approach uses committed specialists to produce innovative solutions to the world’s most complex and challenging tunnel projects. Please visit us during WTC 2016 at Booth 406. 406
18 ASI Marine   611
19 Astaldi S.p.A.   1131
20 Atlas Copco Rock Drills AG   623
21 Austrian Society for Geomechanics   1338
22 Avanti International   1226
23 Babendererde Engineers, LLC   618
24 Bakersfield Pipe & Supply   1308
25 Ballard Marine Construction   1231
26 Bamser   322
27 BASF Corporation   722
28 Bauer Foundation Corp   319
29 Becker Mining America   717
30 Bekaert Maccaferri Underground Solutions (BMUS)   925
31 Bessac   1119
32 Biomarine, Inc   1222
33 Bonar   323
34 Bouygues Travaux Publics   1103
35 Brasfond USA   1135
36 Brazilian Tunnelling Committee   939
37 British Tunnelling Society   525
38 Brokk Inc   709
39 Brookville Equipment Corp   310
40 Cambria County Association For The Blind and Handicapped (CAB)   511
41 Cascade Drilling L.P.   714
42 Case Foundation Company   624
43 CBE Group   812
44 CDM Smith   427
45 ChemGrout, Inc   502
46 Comtrol International   1311
47 Condor Earth Technologies, Inc   415
48 Cowi NA   308
49 CREG TBM Germany GmbH   521
50 Crux Subsurface, Inc   515
51 CTS Cordes tubes & seals GmbH & Co KG   1235
52 Daigh Company, Inc   602
53 Dakota Fabricating Inc   1224
54 Datwyler Sealing Technologies   702
55 David R. Klug & Associates, Inc   802
56 DeNeef Construction Chemicals, Inc   503
57 Denka   920
58 Derrick Equipment Co   608
59 DH Charles Engineering, Inc   420
60 Dibit Measuring Technique USA, Inc   716
61 DMT GmbH & Co KG   914
62 Dr. Sauer & Partners Corp   1013
63 Drumcutters International Inc   610
64 Dry Systems Technologies   403
65 DSI Underground Systems   825
66 E-Berk   1023
67 EC Applications – Tunnel Lining   1313
68 Ein Shemer Rubber Industries A.C.A. Ltd   718
69 Elasto Plastic Concrete   309
70 Ernst & Sohn a John Wiley & Sons Co   320
71 Euclid Chemical Co   1332
72 Euroconsult Group   917
73 Everest Equipment Co   500
74 Fama S.p.A.   1134
75 FBG Korea, Inc   1321
76 Fermacell GmbH   727
77 Fiori Group S.p.A.   1021
78 Forta Corporation   1025
79 Gall Zeidler Consultants   1209
80 Geocomp Corporation/GeoTesting Express, Inc.   915
81 Geoconsult Group   725
82 Geodata S.p.A.   1127
83 Geokon, Inc   712
84 GeoTunnel S.R.L.   1035
85 Gomez International, Inc   1307
86 Grace   1426
87 Grindex Pumps   715
88 Halfen GmbH   318
89 Hatch   1118
90 Hatch Mott MacDonald   806
91 Hayward Baker Inc   626
92 HBI Haerter – Consulting Engineers   1114
93 Heintzmann Corp   710
94 Helix Steel   524
95 Herrenknecht AG   807
96 HIC Fibers, Inc   614
97 HNTB Corp   1106
98 Hobas Pipe USA   719
99 Impreservice Srl   706
100 Industrias Y Servicios El Tigre S.A.   1303
101 InnoTrans 2016   1104
102 Innovative Wireless Technologies   307
103 Istrice Fibres   1225
104 ITA Young Members / UCA Young Members   1214
105 Italffer SpA   1139
106 J.H. Fletcher & Co   526
107 Japan Tunnelling Association   1334
108 Jennmar Corp   620
109 Joint Specialist Immersed Tunnels   1014
110 Joy Global   1417
111 Kern Tunneltechnik SA   1218
112 King Shotcrete Solutions   603
113 Konnx Inc   1317
114 Kosteel Co, Ltd   422
115 Line Power   1230
116 Lovsuns Tunneling Canada Ltd We are proud to have come from a legacy that has built and refurbished 600+ TBMs for 400+ projects around the world. 2500km of completed tunnels is just the start of our ambitious journey into the future. Whether it’s soft ground or hard rock, large or small diameter TBMs, Lovsuns will support you to succeed in most challenging projects with our highly reliable, durable and competitive product solutions from our facilities in Canada and China. 613
117 Malcolm Drilling Co Inc   721
118 Mapei Corp   1136
119 MAT Mischanlagentechnik Branch Office BAUER Maschinen GmbH   408
120 McDowell B Equipment   306
121 McMillen Jacobs Associates McMillen Jacobs Associates, recognized as one of the world’s experts in the design and construction management of tunnels, deep shafts and portals, is a highly technical firm providing expertise in underground infrastructure for the water, wastewater, transit and hydropower markets. See us at WTC: Booth 912, North Exhibit Hall. 912
122 Measurand Inc Measurand Inc. is a leader in shape-sensing technology. We can help you revolutionize your monitoring plan with SAA, a unique chain of inclinom- eters on a reel. SAA is dramatically easier to install, has an unprecedented range, and survives long after others have failed. 700
123 Messinger Bearings   414
124 METALLIANCE   820
125 Metro Vancouver   1403
126 Michels Corp   1320
127 Microtunneling Inc   407
128 Mighty Shield Industries Sdn Bhd   1212
129 MineARC Systems America   723
130 Mining Equipment Ltd   1302
131  Moretrench   519
132  MWH Global   327
133 Naylor Pipe Co   607
134 Nexans AmerCable   1116
135  NFM Technologies   814
136 Nicholson Construction Co   1121
137 Nightstick by Bayco Products Nightstick, designed and manufactured by Bayco Products, is a global brand of professional-grade flashlights, headlamps and Intrinsically Safe lighting solutions that exceed industry standards in performance, quality, user-safety and value. Nightstick Intrinsically Safe lighting is Class I, Division 1 rated featuring certifications from ATEX, IECEX, and MSHA for global use. 400
138 Normet Americas, Inc   907
139 Northern Light Technologies   1211
140 Northwest Laborers-Employers Training Trust   313
141 Numesh Inc   1213
142 Optimas Sofrasar Tunnel Products   703
143 Pacchiosi Drill   1336
144 Palmieri S.p.A.   1234
145 Parsons   324
146 Parsons Brinckerhoff   1007
147 Plaxis Americas LLC   1327
148 Powerking Corp   316
149 Promat International NV   1324
150 Propex   1407
151 Pultrall Inc   612
152 Putzmeister   1018
153 QSP Packers, LLC   421
154 Quaker Chemical   609
155 R.S.T. Instruments Ltd   1527
156 RBL-REI   819
157 Resiplast US, Inc   1306
158 RE-Systems Group Americas Inc   321
159 RETC   1216
160 Richway Industries   1110
161 Richwood   509
162 Robit Plc   1130
163 Rocksoil S.p.A.   1137
164 Rocscience Inc   1113
165 Rocvent Inc   1314
166 Ruen Drilling, Inc   1108
167 Sandvik Construction   1107
168 Schauenburg Flexadux Corp   506
169 Schauenburg MAB GmbH   508
170 Schnabel Foundation Co   713
171 Shannon & Wilson, Inc   1011
172 Shotcrete Technologies, Inc Shotcrete Technologies, Inc has been supplying the mining and tunnel industry with the most efficient Shotcrete products and services for over 30 years. SHOTSET 250 Liquid Accelerator is an industry standard, and the company’s ShotTech Robotic Arm can be mounted on many types of carriers. In addition to Robotic Arms, Accelerators, nozzles etc., Shotcrete Technologies, Inc has developed a robotic centrifugal process that is used in both vertical (shaftlining) and horizontal (shotlining) applications. 1237
173 Sika Corporation   919
174 Skarpa PL   1117
175 Societa Italiana Gallerie   1039
176 Soldata Inc.   1123
177 Spendrup Fan Co   507
178 Stantec   1217
179 Surecrete Inc   520
180 SWS Engineering SPA   1031
181 TPH Bausysteme GmbH   1236
182 Team Mixing Technologies, Inc   1009
183 Technical Tunnelling Components Ltd (TTC)   813
184 Tenbusch, Inc   1017
185 Terratec Ltd   606
186 The Norwegian Tunnelling Society   824
187 The PBE Group   1406
188 The Robbins Co   931
189 Thompson Pipe Group   312
190 TNO Diana BV   617
191 TPH Bausysteme GmbH   1236
192 TRE Canada Inc   1125
193 Trelleborg Engineered Products   1015
194 Treviicos   1132
195 Tsurumi Pump   1112
196 Tunelmak Construction Machinery inc   1120
197 Tunnels & Tunnelling   1215
198 Turkish Road Association   1423
199 Turkish Tunnelling Society   1223
200 UWK – Underwater Kinetics   1233
201 Victaulic Co   1221
202 VIP-Polymers Ltd   522
203 VMT GmbH   707
204 Wacker Chemie AG   821
205 Wisko America, Inc   1204
206 Yamamoto Rock Splitter International   1003
207 ZED Tunnel Guidance Ltd   417