Increasingly tight tolerances included in many specifications demand a fast, accurate and reliable method for determining these values.

VMT has introduced a Laser Interferometer system to enhance the speed and accuracy of its earlier Photogrammetric System, for the measurement of moulds as well as the segments themselves.

Extensive use of this technique has been made on the CTRL project as well as in Europe and the Far East.

The use of a Laser interferometer system enables the accurate digitization of surfaces by direct polar coordinate measurement.

Measurement to a single spherical retroreflective prism enables the skilled operator to comprehensively measure the full profile of the object to be measured with up to 20 segments per shift being achievable. The system only requires one operator.

Tel: +49 7251 96 99 0

Email: international@vmt-gmbh.de