Encardio-rite manufactures and supplies a comprehensive range of instrumentation for monitoring tunnels and underground cavities. It also provides technical support including engineering, installation and commissioning, data monitoring and training.

Radial/tangential pressure cells, embedment/arc weldable strain gages, borehole extensometers, measuring anchors, shotcrete strain gages, center hole load cells, piezometers, tape extensometers, magnetic extensometer, portable readout loggers and data acquisition systems are a part of instrumentation used in tunnel monitoring along with surveying accessories like bireflex/prism targets, surface settlement points, building settlement points and crack gages, etc.

Based on its expertise in the field, Encardio-rite was awarded a subcontract for instrumentation works on the Dubai Metro’s Red Line Project, in 2006. This year, Encardio-rite also won an additional subcontract for instrumentation on the system’s Green Line. Works include; supply, installation and commissioning of surface and subsurface instrumentation of tunnel sections and 10 underground stations; monitoring and submission of data of installed instruments in proper formats to authorities/consultants; drilling of boreholes for installation of instruments;and surface surveying with total stations and digital level of Red Line

Encardio-rite has also supplied instrumentation for several other metros and tunnels around the world including the Athens Metro, Pir Panjal and Konkan Railways.

Encardio-rite Electronics

Tel: +91 522 266 1044
Email: sales@encardio.com
Website: www.encardio.com


Encardio-rite monitor instrumentation on Dubai’s Metro Red Line