Under the brand name FiReP, the Beltec-Rockbolt Systems Group offers a range of solutions using glass fibre reinforced polymers. The company says its know-how covers all aspects from development to production and application of rockbolting systems, reinforcement, formwork tie rods and special applications.
Benefits of GRP bolts are said to include good machine-ability, corrosion resistance, high tensile strength, low weight, easy handling and good ductility.
The company offers three types of FiReP rockbolting systems:
- All-thread bolts (rods and tubes)
- Self-drilling bolts
- Cable bolts
Beltec-Rockbolt Systems
Tel: +41 55 221 41 07
E-mail info@ch.rockboltsystems.com
Web: www.rockboltsystems.com