The range of civil explosives and initiation systems manufactured by Maxam and the company’s technical assistance service are said to allow users to blast rock efficiently, at the lowest cost and with the highest safety level.
Maxam describes itself as a key ally in the construction phase of infrastructure projects, “overcoming any obstacles presented in the construction of bridges, tunnels, roads, railways, and hydroelectric power stations”.
Its initiation systems include traditional products such as detonating cords and electric detonators to seismic detonators. The company adds: “The non-electric Primadet or electric Riotronic detonators are renowned for their total reliability and maximum precision, guaranteeing a full blast initiation of the blast in all circumstances along with the highest levels of efficiency.”
Maxam’s technical advice, supported by more than 130 years’ experience, encompasses all stages of a project from the use of laser technology in the analysis of bench profiles to predicting fragmentation and profiling the resulting muckpile by means of blast designs.
Maxam Corp
Tel: +34 91 722 01 00
Email: general@maxam-corp.com
Web: www.maxam-corp.com