Reed has launched the B20HP-SKD shotcrete pump specifically designed for underground applications such as shotcrete, grouting, concrete and backfill. Skid-mounting is said to make the B20HP-SKD suitable for cross mounting on a truck, carrier or stand alone unit.
The pump is designed to achieve concrete pressure up to 2113psi (145 bar) and delivery rates up to 14yd3/hr (11m3/hr).
Reed
Tel: +1 909 287 2100
Email: mike.newcomb@reedmfg.com
Web: www.reedpumps.com