Rockmore International’s Marathon carbide insert for button bits combine higher hardness properties with longer-lasting performance to handle extreme, abrasive rock-drilling conditions.
Marathon carbides employ micro-structural design changes to provide increased hardness while maintaining optimum toughness characteristics that resist catastrophic fracture. This means they last up to 20% longer than previous designs in water-well and mining environments. They are available for all DTH bits designated for water-well drilling up to 10 inches in diameter with button sizes up 3/4”.
Rockmore International
Tel: +1 503 682 1001
Email: info@rockmore-intl.com
Web: www.rockmore-intl.com