Part of the Mining Equipment group, Jetair Fans build new Jetair Axiflow Fans up to 500HP and 84” diameter. The company has developed a line of Super-Silenced fans that run quieter and take up less space than other integrated fan and silencers.
Jetair can also roll steel ventilation ducting on-site for mining or tunnelling projects. Ducting as small as 12” and as large as 84” can be rolled on-site. Jetair is currently doing business in North and South America, Australia, Asia, Africa and Europe.
Jetair Fans
Tel: +1 970 259 0412
Email: miningequipment@obii.net
Web: www.jetairfans.com
Jetair Axiflow Fans