The topics that will be covered, along with associated speakers, is as follows:

  • Introduction and Tideway progress during 2022
    Jim Avant (Delivery Director, Tideway)
  • West Area Secondary Lining
    Alexei Bond (BMB) and Ryan Moor (Tideway / Jacobs)
  • King Edward Memorial Park, challenges and solutions
    Ania Gonzalez (Tideway / Jacobs) and Jo Kujovic (CVB)
  • Planning for Systems Commissioning
    Phil Robinson (Systems Commissioning Manager, Tideway)
  • Plan for 2023
    James Smith (Deputy Programme Director, Tideway)