Specialist Plant Associates have extensive engineering knowledge of ventilation requirements for tunnels, shafts, top-down excavations and confined spaces.
The company operates one of the UK’s most substantial hire fleets of ventilation fans and can supply fans and ducting to suit most applications. Its hire fleet includes: axial flow fans; bifurcated fans for handling methane contaminated air; centrifugal fans for high pressure applications utilising small-diameter duct in pipejacks or confined spaces; and dust extractors (wet type) for removal of respirable dust from the air.
Specialist Plant Associates
Tel: +44 1234 781882
Email: info@specialistplant.co.uk
Web: www.specialistplant.co.uk