Fogtec is a leading supplier of fire suppression systems for tunnels and other sub-surface facilities. “Water based fire suppression systems are mainly installed under the ceiling of a tunnel to provide protection against fires, with specially designed components that are suited to these harsh environments,” says the company. Fogtec’s turnkey fire suppression system services are said to include:
- Conceptual studies
- Detailed design
- Execution
- Commissioning and maintenance
A team of specialists, which includes graduate engineers in fire protection, hydraulics, mechanics, electronics and chemistry, aim to offer state-of-the-art service on a 24/7 basis.
“Participation in international projects such as UPTUN, FIT, COSUF and SOLIT reflects the sound basis of Fogtec’s know how,” the company adds.
Fogtec
Tel: +49 221 96 22 3 14
Web: www.fogtec.com
Firefighters attempt to battle an in-tunnel blaze A Fogtec suppression system being installed