The company also supplied segment lifting frames to CTRL’s C240 for its 7.15m internal diameter fibre-reinforced precast concrete lining. In addition, Spheroidal Graphite Iron (SGI) segment lifting bridles, roller bolts and associated items to suit 3.5m and 4.5m internal diameter linings were supplied to CTRL C220, C240 and London King’s Cross projects.
Specialist Plant Associates are also the UK agents for the CIFA range of concrete segment manufacturing moulds and equipment.
Tel: +44 1234 781 882
Email: info@specialistplant.co.uk