The Industrial and Commercial Bank of China (ICBC) has agreed a RMB1.2bn (US$146M) 15 year loan for the construction of a RMB1.7bn (US$209M) road tunnel under the Huangpu river in Shanghai. The scheme, part of the city’s outer ring road, will be developed under a build-operate-transfer concession.