SoftXS has announced the release of version 9.2 of DrawMGT. DrawMGT manages design and construction drawings, documents and the tasks necessary for review and revision. The program was created specifically for tunnelling and is “ideally suited for projects with participants from multiple organisations, located at multiple sites,” says SoftXS.

DrawMGT manages the status of drawings and documents, making links to the tasks associated with their production and updating. It also helps users to coordinate design and construction management tasks with other project activities.

DrawMGT is an Internet-based web application and requires no software beyond the DrawMGT server. Major features include:

  • Version/Revision Management – Construction drawings and documents
  • Design Management – Tracking design, check, approval, submittal
  • Task Management – Common construction tasks supported
  • Automatic Document Classification – Based on drawing code values and project specific defaults
  • Indexing and Searching – Industry standard and project-specific classification criteria supported
  • Lists and Reports – Drawing and task lists. Multiple list formats and sorting
  • Drawing Submittals – Automatic delivery of drawings approved for construction
  • Data Import/Export – Bulk upload and download of data
  • Secure – Multiple permission levels (user roles) and comprehensive audit trail

SoftXS

Email: softxs@softxs.ch
Web: www.softxs.ch


Screen output from the SoftXS document management system