The ITC Superloader comprises a basic frame on a crawler with a 1m wide integrated, heavy-duty conveyor. The machine is driven by one diesel and one electric engine to allow emission-free working at the face and is equipped with a cable reel and mucking boom equipment.
This Superloader, which is said to be simple to handle, allows the operator to reach loading capacities up to 8-10m3/min, even under difficult conditions such as hard and abrasive rock. ITC says a 20m3 dump truck can be loaded in just two minutes. “Thanks to this easy handling and maintenance system the running cost of this machine are extremely low,” the company adds.