The SecuriSens TSC 515 features a “very high level of safety, low planning expenditure and simple installation and mounting,” says manufacturer Securiton. Small temperature sensors are fitted regularly along a ribbon cable used as a data and supply bus. The TSC 515 is an encapsulated acquisition and bus system integrated in the cable and resists environmental pollution.
Securiton
Tel: +41 31 910 11 22
Email: info@securiton.eu
Web: www.securiton.eu
The SecuriSens TSC 515 Typical applications for the SecuriSens include road tunnels