The “hazardous” conditions that caused Bilfinger Berger to halt the TBM drives “Stable” rock conditions “Fractured” rock conditions
Serving the tunnelling industry since 1969.
The “hazardous” conditions that caused Bilfinger Berger to halt the TBM drives “Stable” rock conditions “Fractured” rock conditions