1563BR
Job Category Railways
Job Profile Hatch Mott MacDonald (HMM) is an award-winning consulting engineering firm with major success in the fields of rail and transit; highways and bridges; water and water resources; wastewater; tunnels; environment; municipal engineering; aviation; ports and harbors; architectural services; and pipeline services. We have earned a reputation for technical excellence on some of the world’s most prominent and challenging projects. HMM is a rapidly growing firm with over 55 offices throughout North America, providing a full range of engineering services, from planning and design through construction management. We are seeking highly motivated individuals to join our dynamic team of professionals in locations throughout the US and Canada.
Job Description Sr Manager will be responsible for business development and management of large transportation projects in southern California. Candidate will ultimately be responsible for large Rail/Transit/Tunnel and Highway projects, design and construction management.
EEO
Candidate Specification Ideal candidate should have experience in managing heavy rail, light rail, tunnel and highway projects. Both in design and construction management.
In the begining, major responsbility will be to build the project business in southern Calif. Ideal candidate should be a seller/doer. Two positions, one position should have Calif PE and the other position Calif PE is a preference, but not requirement. Both positions candidate should have strong engineering background in these scopes described above.
Contract Type: Regular (US only)
Work Pattern: Full-Time
Country: United States
Region / State: California
Position Location: Southern California
Recruiter Contact: Troup
Submit resumes online at www.hatchmott.com, refer to Careers website and Job # 15634BR