The four mile long (6.4km) walking and cycling route between Bath and Midford includes what will be Britain’s longest cycling tunnel, the Combe Down Tunnel. The tunnel will feature an interactive light and sound installation, Sustrans stated.
The opening of the Two Tunnels Greenway is on 6 April 2013.