China has opened the world’s second highest road tunnel, a 1.5km long tunnel link through the 3.8km high Daban Mountains in north west Qinghai Province on the Qinghai-Tibet Plateau. The tunnel was built at a cost of $20m.
Serving the tunnelling industry since 1969.
China has opened the world’s second highest road tunnel, a 1.5km long tunnel link through the 3.8km high Daban Mountains in north west Qinghai Province on the Qinghai-Tibet Plateau. The tunnel was built at a cost of $20m.