The tunnel drive was 700m at a 5.7m finished diameter. The parallel 678m tube broke through on 18 September. Maximum depth was 18m where the alignment passed below Tilak Bridge.
The EPBM was manufactured by Shanghai Metro Shield Corporation. Segments were cast at the Mundka Casting Yard.