Bruce Matheson, FIMMM, summarised proceedings: "Delegates mainly comprised local engineers but there was also a significant international contingent, including a sizable contingent from the Copenhagen Metro. The papers covered a multitude of subjects, with keynote papers from Dr. Nick Barton (Nick Barton and Associates), Professor C. F. Lee (University of Hong Kong), Lok Home (Robbins) and Dr. Martin Herrenknecht (Herrenknecht) and with other papers covering matters from technical design issues to case studies. All of the presentations were well received by the enthusiastic crowd.

"Congratulations should be extended to the conference organisers, the Hong Kong Branch of the IOM3."

For more information on IOM3 (Hong Kong Branch) or the Hong Kong Tunnelling Society please email Secretary@iom3.org.hk or come along to the Mariners Club on the last Friday of each month.