The find was made during archeological digs ahead of the A26 project in County Antrim. The network of passages which have been found date back to the early medieval period, ranging from 600AD to 1200AD.
Some of them are lined with stone, and were used by residents to hide from raiding parties, who would have scoured the area looking for potential slaves.