Nyx’s Tunnel Lighting Addressable Control System (TLACS) controls tunnel luminaires and enables operators to save substantially on energy and maintenance costs, Nyx Hemera Technologies stated.
"With over 100 road tunnels, including 75 tunnels of over 500m in the Greek Trans-European Road Network, Greece has an interesting potential, especially now as tunnel operators are looking for solutions to significantly reduce their operational expenses," said Pierre Longtin, president and CEO of Nyx Hemera Technologies.
The TLACS is one of the most technologically advanced tunnel lighting control system on the market, Nyx Hemera Technologies claims. TLACS is installed in one of the longest tunnels in the world, the Kallang – Paya Lebar Expressway in Singapore.