A US$151M contract has been signed for the design and construction of the 56km long Sulakan tunnel in Iran between contractor SELI and client the Rafsanjan Development Organisation.

Serving the tunnelling industry since 1969.
A US$151M contract has been signed for the design and construction of the 56km long Sulakan tunnel in Iran between contractor SELI and client the Rafsanjan Development Organisation.