The 11ft diameter TBM’s drive of 3,200ft passed beneath the River Des Peres in south St. Louis. Tunnelling had launched in February at a 175ft-deep south shaft.
Scheduled for completion in 2015, the force main will replace one previously construction in the 1960s, which will be taken out of service and inspected.