The USD 804M extension serves the city’s southwestern suburbs and will have 10 stations, although only five are currently operational.

The initial 7km section of Line Three between Shahid Beheshti and Vali-e Asr opened in December 2012, and construction is underway on the third phase, which will extend the line 18km northeast to Hossein Abad.

The completion of the second phase of Line Three takes the total length of the Tehran metro network to 152km with 85 stations.