Civils 2000, a show totally dedicated to civil engineering and supported by UK magazine New Civil Engineer, will be held on May 22-25 2000 at Hall 9 at the NEC in Birmingham, UK. Contact: Tel +44 171 5056644.

Serving the tunnelling industry since 1969.
Civils 2000, a show totally dedicated to civil engineering and supported by UK magazine New Civil Engineer, will be held on May 22-25 2000 at Hall 9 at the NEC in Birmingham, UK. Contact: Tel +44 171 5056644.