There will also be three intermediate shafts to support construction, then during operation they will be used for ventilation and maintenance access.
Five hard rock machines will excavate the Redcar Mudstone. Planning consent has been given for a 6m-diameter tunnel, but the design is still being finalised and the range being explored is 4-6m diameter. The tunnel will be lined with segmental rings with sprayed concrete for caverns.